Bitcoin Mining Colocation

As a Tier-3 facility, 4D Data Centres offers secure and robust colocation and connectivity for cryptocurrency miners looking to maximise profits.

Get Pricing

Why mine with colocation?

Colocation guarantees your miners the highest possible uptime, by providing a stable environment for power, cooling and connectivity that will reduce failures and allow you to push your miners harder through overclocking.

Our purpose built UK data centre provides hosted mining for all types of crypto miners, including Bitcoin, Litecoin and Dash.

Starter Rig

  • Supports up to 28 hashes of mining hardware
  • Supports all miners at 14THs inc AntMiner S9 / Avalon6 / GekkoScience
  • Maximum Power Draw - 12 Amps / 2.8 KW
  • Power Feeds - UPS and generator backed A+B diverse power
  • Free shelves for hardware
  • Locks - 3 digit combination (key and biometric available)
  • Height - 22u

Advanced Rig

  • Supports up to 75 hashes of mining hardware
  • Supports all miners at 14THs inc AntMiner S9 / Avalon6 / GekkoScience
  • Maximum Power Draw - 32 Amps / 7.7 KW
  • Power Feeds - UPS and generator backed A+B diverse power
  • Free shelves for hardware
  • Locks - 3 digit combination (key and biometric available)
  • Height - 47u

Enterprise Rig

  • Supports up to 225 hashes of mining hardware
  • Supports all miners at 14THs inc AntMiner S9 / Avalon6 / GekkoScience
  • Maximum Power Draw - 96 Amps / 23.1 KW
  • Power Feeds - UPS and generator backed A+B diverse power
  • Free shelves for hardware
  • Locks - 3 digit combination (key and biometric available)
  • Height - 3 x 47u

Why mine with 4D

Our directors have operated mining platforms and understand the economics of cryptocurrency mining. We also have the technical expertise in-house. Our first line engineers are available 24x7x365 to perform tasks such as installing / configuring new miners, performing repairs and handling returns where needed.

Reliability:

Miners will receive the highest quality infrastructure and SLAs you'd expect from a Tier-3 data centre.

This includes our power and network SLAs which guarantees 100% and 99.999% uptime for these two critical services respectively.

  • Power: All technical hardware is protected by diverse Uninterruptible Power Supply (UPS) systems. These provide a constant supply of power to your miners and protects them from surges - on-site generators also supply the facility with a continuous power source in the event of a mains outage.
     

  • Network: The network is built on our diverse fibre ring and your miners will be connected directly into our Cisco core, with transit being provided from our blended feed of tier-1 carriers and peering exchanges (AS31463).

Power Density:

Miners are extremely power dense.

The latest Bitcoin mining equipment (such as the Antminer S9) will utilise up to 1.4KW per unit. Anyone wanting to mine at scale will therefore need a significant amount of power in a small footprint. In our Gatwick data centre we can supply up to 96 Amps / 23 KW per rack.
 

Cooling:

Enterprise scale mining generates a lot of heat.

Beyond a couple of miners, it becomes impossible to dissipate heat naturally and therefore active cooling is required. We provide resilient cooling through cold aisle containment and complete blanking of empty spaces. For higher density deployments we can supplement the standard cooling with chilled water doors.

Call us today on 020 7183 0603 or contact us below

FREE no obligation quote

Simply fill out this form and an expert from the 4D team will be in touch to discuss your cryptocurrency needs ASAP